Incorrect WBS number determined in SD Contract

$
0
0

Hi,

 

We have configured our system such that when a material is added in the contract, WBS (level 1) gets created for each material in contract. These WBS are then assigned to the main project.

 

I have a contract with a material in line item 10 and its wbs is ABD-Contract no- Line item no (10)

Similarly for material in line item 20 of contract its WBS is ABD-Contract no- line item (20)

 

Both the above WBS has been closed and its current status is CLSD.

 

Now when i try to add a new line item in contract (line item 30), the system is determining the WBS element no. as ABD-contrac no- line item no 20. and the system is giving error as "System status CLSD is active for WBS ABD-Contract no- Line item 20

 

Can anyone tell me why the system is determining the WBS of line item 20 when i try to add new material to line item 30. Ideally the WBS should have been ABD-Contractno - Line item no 30

 

Any inputs on this?

 

Thanks

 