Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9041

Re: when i am costing a material system is pickig the old cost estiamte

$
0
0

Hi..

Although row material for FG or SFG have “do not cost” flag, row material’s cost is included in std cost for them.

To exclude row material with do not cost” flag, Refer to below picture.

aa.png

cc.png


Viewing all articles
Browse latest Browse all 9041

Trending Articles